P. ENGINEERING, PLLC
THIS REQUIREMENT IS FOR THE INSTALLATION OF A BACKUP POWER GENERATION SYSTEM WITH AUTOMATIC TRANSFER SWITCH (ATC) AT THE FOLLOWING TWO (2) LOCATIONS: SAN ANGELO NASOC ADMINISTRATION BLDG., SAN ANGELO TEXAS, SAN ANGELO MU2 HANGAR, SAN ANGEL…
View on USAspending.gov → · Award 70B01C26C00000100 · Definitive Contract